Kitchen remodeling
Kitchen Remodel Cost Breakdown: Line-by-Line Pricing Guide (2026)
Detailed cost breakdowns for minor ($15k–$25k), midrange ($30k–$55k), and upscale ($70k–$130k) kitchen renovations with material and labor line items.
Data reviewed October 24, 2026
Understanding kitchen remodel line items before hiring contractors prevents costly scope creep. This cost guide provides national averages, square foot benchmarks, and material breakdowns based on data from the National Kitchen & Bath Association.
| Renovation Component | Minor Refresh | Midrange Full | Upscale Custom |
|---|---|---|---|
| Cabinetry & Hardware | $4,500 | $14,500 | $38,000 |
| Countertops (40 sq ft) | $2,200 | $4,800 | $10,500 |
| Appliance Package | $2,400 | $6,500 | $18,000 |
| Contractor Labor | $5,000 | $16,000 | $42,000 |
| Plumbing & Electrical | $1,200 | $4,200 | $9,500 |
| Total Project Range | $15,300 | $46,000 | $118,000 |
Cabinets: Stock vs Semi-Custom vs Custom
Cabinets represent approximately 30% to 35% of total project costs. Stock pre-assembled cabinets range from $150 to $300 per linear foot ($4,000–$7,500 total). Semi-custom cabinets offer plywood construction and dovetail drawers at $350 to $650 per linear foot. Custom solid hardwoods range from $800 to $1,500+ per foot.
Countertops: Quartz, Granite & Sintered Stone
Engineered quartz ($65–$120/sq ft installed) dominates modern kitchens due to non-porous stain resistance. Natural granite ($50–$100/sq ft) requires periodic sealing. Butcher block ($40–$75/sq ft) provides an affordable DIY-friendly alternative.
Trade Labor & Permit Requirements
Labor accounts for 35% to 40% of general contractor bids. Trade breakdown averages: plumbing rough-in ($1,500–$3,500), dedicated electrical circuits and LED lighting ($2,000–$4,500), tile setting ($1,200–$2,500), and city building permits ($400–$1,200).
Frequently asked questions
- What is the single biggest expense in a kitchen remodel?
- Cabinetry is almost always the largest line item, accounting for roughly one-third of the total renovation budget.
- How long does a kitchen remodel take from demolition to completion?
- A typical midrange kitchen remodel takes 6 to 9 weeks of active construction once custom cabinets are delivered on site.